NESPAK is already providing consultancy services for Detailed Design and Field Design Support Services (FDSS) for New Gwadar International Airport Project. The estimated cost of additional works is around Rs 10 billion. Meanwhile, the Amendment No.2 incorporating the additional scope of work was signed by Pakistan Civil Aviation Authority and NESPK at P&D Directorate, Karsaz, Karachi. The Consultancy Agreement has been already signed between NESPAK and Pakistan Civil Aviation Authority (PCAA). are covered under Pakistani side scope of works for which NESPAK will act as the “Engineer” for the construction supervision services. The additional works related to power supply and security infrastructure works of airside, construction of residential complex for CAA’s staff and Camp for Airport Security Force (ASF) staff including all external services i.e., water supply network, storm water drainage works, roads, firefighting works, power supply network, telecommunication works, etc. Main components of the airport such as main runway, taxiways, apron, visual aids, navigational aids, ATC tower, FCR building, radar & radio building, AFL works, water works, car parking and some ancillary buildings are being undertaken by the Chinese side for which NESPAK in PMC role will act as “Employer’s Representative”. ![]() The NGIA project is being implemented under the China Pakistan Economic Corridor (CPEC) program. Tahir Masood, Managing Director NESPAK here on Thursday. NESPAK has won the Project Management Consultancy (PMC) Services in an open bidding for the construction of New Gwadar International Airport (NGIA) Project, it was stated by Dr.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |